The New Zealand Transport Agency (NZTA) creates transport solutions for a thriving New Zealand. NZTA achieves this through four core business functions:
Darzin is being used as a centre stakeholder engagement and stakeholder management system for NZTA key road development projects around Wellington. Some of these projects are:
Artist impression of the Wellington to Hutt Valley Walking, Cycling Resilience Project
After seeing Darzin used by a number of consultants to effectively manage formal submission processes across iconic road development projects, NZTA decided to implement Darzin as their stakeholder engagement system across all NZTA’s major projects in the Wellington area. All consultants’ engagement data were brought in under NZTA license for better sharing of info and long term data tracking. Specific user access levels were created in Darzin to allow the engagement consultants to access their projects while NZTA has the oversight of all data captured in Darzin. Importantly, NZTA is able to retain the project related information as well as track and report across multiple projects.
Darzin provides tools to enable NZTA to meet key objectives in stakeholder management:
In addition, having all stakeholder engagement data stored in Darzin also enables long term knowledge capture and management. End of construction phase all consultation data entered by consultants and contractors remain in Darzin and NZTA staff can continue to build on the existing knowledge with minimum transitional interruption.